建筑师:MMBB Arquitetos
地点:圣贝尔纳多-杜坎普,圣保罗,巴西
类别:装修
作者:Marta Moreira,Milton Braga
设计团队:Adriano Bergemann,CecíliaGóes,Gleuson Pinheiro,Guilherme Pianca,Lucas Vieira,JúliaMarques,MariaJoãoFigueiredo,Martin Benavidez。
区域:面积1688.0平方米
项目年:2014
照片:费德里科·凯罗利
制造商:Trimble Navigation,Autodesk
The building of the Monteiro Lobato Library was originally designed for the headquarters of the Brazilian Post and Telegraph Company.
The goal of the renovation project is to value the public facility so that it stands out in the city's dynamics. In general, interventions should recover the environmental conditions of the building, the square, and its surroundings; update the electro-electronic, hydraulic and air conditioning installation systems with better performance solutions for consumption; and ensure comfort and safety conditions for users and the archive.
The conditions and uses of the square's surroundings were examined to strengthen the potential of the urban context in which the Library is located.
On the ground floor, there shall be an open library, that is, direct public access to the general collection: after going through the entrance control, the visitor shall be free to access the books and handle them at the tables arranged throughout the room.
All masonry walls and non-structural elements will be demolished to form a single room filled with low and curvilinear bookshelves.
The entire facade will be assembled in fixed glass panels, with openings only on the upper part of the frame. A screen panel will be placed close to the glass for both mechanical and sun protection ( like a brise soleil). This way, avoiding the installation of fences around the perimeter of the lot, opening the library gardens to the city.
Also on the ground floor, an extension of the library will be built, as an attachment, in a concrete structure. In this new space, there will be a multipurpose room and a café, which may be accessed independently of the library's opening hours.
The second floor of the pre-existing building will be reserved for more private activities, such as administration, access to the rarer books and the Braille rooms.
MonteiroLobato图书馆的建筑最初是为巴西邮电公司总部设计的。
改造项目的目标是重视公共设施,使其在城市的动态中脱颖而出。一般来说,干预措施应恢复建筑、广场及其周围环境条件;更新电子、液压和空调安装系统,采用更好的性能解决方案进行消费;确保用户和存档。
为了增强图书馆所在城市环境的潜力,对广场周围环境的条件和用途进行了研究。
一楼应设有开放式图书馆,即公众直接进入一般藏品:通过入口控制后,访客可自由进入书籍,并在房间内布置的桌子上处理书籍。
所有砖墙和非结构构件将被拆除,形成一个充满低曲线书架的单人房间。
整个立面将装配在固定玻璃板中,开口仅位于框架上部。屏幕面板将靠近玻璃放置,用于机械和防晒(如布里斯太阳)。这样,就避免了在地块周围安装栅栏,打开了通往城市的图书馆花园。
同样,在一楼,图书馆的扩建部分将作为一个附件,建造在一个混凝土结构中。在这个新的空间里,将有一个多功能房间和一个咖啡馆,可以独立于图书馆的开放时间进入。
现有大楼的二楼将预留给更多的私人活动,如行政管理、访问稀有书籍和盲文室。